Pwa diff mode indct

Solicitation (Request for quotation) from Navsup Weapon Systems Support Mech. Responses are due Nov 20, 2026 (1 day left).

Open to all (no set-aside)Any registered business can bid, large or small.Who qualifies
  • 1Days left to respond
  • 47 daysThis buyer usually gives
  • 56%Notices this buyer changes
  • $789KTypical award from this office

What BidCamel found about this buyer

  • This office usually gives bidders 47 days to respond; this notice gives 32 days.
  • It changed 56% of its 942 notices after posting, so check for amendments before you submit.
  • It has 496 open bids right now. See them all.
  • It has made 34 awards in our records, typically $789K.

Companies this office paid before

  • Martin-Baker Aircraft Company Limited: 5 awards, $24.2M total
  • Nammo Defense Systems Inc.: 3 awards, $7.0M total
  • Rockwell Collins, Inc.: 2 awards, $7.4M total
  • Eaglepicher Technologies Llc: 2 awards, $5.5M total
  • Applied Energy Technology Corp: 2 awards, $1.2M total

These are past winners at this office, not the winner of this exact contract.

Key details
Solicitation number
N0010427QTA13
NAICS code
332510 Hardware Manufacturing
Size standard for this code
750 employees
Set-aside
Open to all (no set-aside)
Buying
Product
Place
Mechanicsburg, PA · Pennsylvania bids
Posted
Oct 19, 2026
Last changed
Nov 6, 2026 (2 versions)
Contact
Contact details are on the SAM.gov notice. Open on SAM.gov

Description

CONTACT INFORMATION|4|N771.2|HQH|771-229-0537|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION/ACCEPTANCE POINT|6||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO RECEIVING AND INVOICE||TBD|N00104|TBD|TBD|TBD|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|[email protected]| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This amendment has been created to extend the submission window. This solicitation is issued pursuant to Emergency Acquisition Flexibilities (EAF). Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. The Government is seeking a Repair Turnaround Time (RTAT) of: __229_Days_ Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work. Your quote should include the following information: QUOTE AMOUNT AND RTAT o Unit Price:__________ o Total Price:__________ o Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE) ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________ TESTING AND EVALUATION IF BEYOND REPAIR T&E fee/price (if asset is determined Beyond Repair (BR) / Beyond Economic Repair (BER)): _____________ AWARDEE INFO & PERFORMANCE LOCATION o Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as ""awardee CAGE"":__________ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW New unit price:__________ New unit delivery lead-time:__________ IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a ""reconciliation modification"" at the end of the contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. In reference to the above important note, the contractor provides the following price reduction amount per unit per month the contractor does not meet the RTAT: $__________, up to a maximum of: $_________. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PWA DIFF MODE INDCT . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=MIL-STD-129 | | |R |180524|A| |01| 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PWA DIFF MODE INDCT repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;27192 MC-023170-01; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall…

Read the full notice and attachments on SAM.gov

Similar open bids

All open bids for NAICS 332510

From SAM.gov and USAspending.gov public data. BidCamel adds the buyer and award facts.

Save and get alerts