Kautz road substation construcion, uip subproject 2- krs
Solicitation from Fermilab - Doe Contractor. Responses are due Dec 18, 2026 (29 days left).
- 29Days left to respond
- 24 daysThis buyer usually gives
- 33%Notices this buyer changes
- -Typical award from this office
What BidCamel found about this buyer
- This office usually gives bidders 24 days to respond; this notice gives 46 days.
- It changed 33% of its 15 notices after posting, so check for amendments before you submit.
- It has 9 open bids right now. See them all.
- We have no past awards from this office yet.
Key details
- Solicitation number
- RFP-383167-CD
- NAICS code
- 237130 Power and Communication Line and Related
- Size standard for this code
- 45 million dollars in average annual revenue
- Set-aside
- Open to all (no set-aside)
- Buying
- Service
- Place
- Batavia, IL · Illinois bids
- Posted
- Nov 2, 2026
- Last changed
- Nov 5, 2026 (2 versions)
- Contact
- Contact details are on the SAM.gov notice. Open on SAM.gov
Description
November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.
Similar open bids
1 day leftNov 21, 2026
504-21-703 Training and Admin Support Space Construction
257-NETWORK Contract Office 17 (36C257)
Veteran-ownedPresolicitation
13 days leftDec 3, 2026
FCI Marion - Emergency Repair Tornado Damage
Fao
Small businessCombined Synopsis/Solicitation
28 days leftDec 18, 2026
P210 electric power plant and electrical distribution system at chabelley airfield, djibouti
Navfacsyscom Atlantic
Presolicitation
106 days leftMar 5, 2027
COTP Series Capacitor Two-Phase Design Build
Western-sierra Nevada Region
Solicitation
From SAM.gov and USAspending.gov public data. BidCamel adds the buyer and award facts.