FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)

Solicitation (Invitation for bids) from 246-Network Contracting Office 6 (36c246). Responses are due Dec 2, 2026 (12 days left).

Service-disabled veteran-owned (SDVOSB)Reserved for small firms owned and run by service-disabled veterans.Who qualifies
  • 12Days left to respond
  • 12 daysThis buyer usually gives
  • 28%Notices this buyer changes
  • $379KTypical award from this office

What BidCamel found about this buyer

  • This office usually gives bidders 12 days to respond; this notice gives 40 days.
  • It changed 28% of its 111 notices after posting, so check for amendments before you submit.
  • It has 11 open bids right now. See them all.
  • It has made 21 awards in our records, typically $379K.

Companies this office paid before

  • Cavu Consulting Llc: 2 awards, $251K total
  • Sun Control Systems Llc: 2 awards, $72K total
  • Zonaestilo, Llc: 2 awards, $69K total
  • Durham Exchange Club Industries, Inc: 1 award, $7.0M total
  • Jett'S Specialty Contracting, Llc: 1 award, $4.9M total

These are past winners at this office, not the winner of this exact contract.

Key details
Solicitation number
36C24626B0041_1
NAICS code
236220 Commercial and Institutional Building Construction
Size standard for this code
45 million dollars in average annual revenue
Set-aside
Service-disabled veteran-owned (SDVOSB)
Buying
Service
Place
Durham, NC · North Carolina bids
Posted
Oct 23, 2026
Last changed
Oct 23, 2026
Contact
Contact details are on the SAM.gov notice. Open on SAM.gov

Description

Replace Domestic Water, Chilled Water, and Steam Piping Project Number 558-24-160 STATEMENT OF WORK Description of Work - Summary: The piping at the Durham VA Health Care Center, 508 Fulton St, Durham, NC is aging. There is an immediate need to replace the domestic water, chilled water and steam piping. General: The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. The contractor shall provide phasing coordination for each section below to minimize impact of normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and storage for this project. All work shall be performed according to the attached drawings and specifications. The VA will accept the Superintendent shall perform the roles and responsibilities of Superintendent and Quality Control—dual hat. Safety officer must remain separate. Place of Performance: Tasks will be performed at the VA Medical Center Durham, VA. Work will be around an occupied healthcare facility in operation 24 hours a day. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to clinic and medical center operations. Period of Performance: Completion of project shall be 603 calendar days from NTP. This includes procurement of long lead time items.

Read the full notice and attachments on SAM.gov

Similar open bids

All open bids for NAICS 236220

From SAM.gov and USAspending.gov public data. BidCamel adds the buyer and award facts.

Save and get alerts