FCI Oxford - Water Softener
Combined Synopsis/Solicitation (Request for quotation) from Fao. Responses are due Dec 4, 2026 (15 days left).
- 15Days left to respond
- 33 daysThis buyer usually gives
- 20%Notices this buyer changes
- $1.6MTypical award from this office
What BidCamel found about this buyer
- This office usually gives bidders 33 days to respond; this notice gives 28 days.
- It changed 20% of its 65 notices after posting, so check for amendments before you submit.
- It has 14 open bids right now. See them all.
- It has made 8 awards in our records, typically $1.6M.
Companies this office paid before
- Dlr Group Inc.: 1 award, $7.5M total
- George Butler Associates Inc: 1 award, $7.5M total
- South Alabama Contracting Llc: 1 award, $5.4M total
- Graham County Community College District Thatcher: 1 award, $2.1M total
- A&G Septic and Grease Llc: 1 award, $1.2M total
These are past winners at this office, not the winner of this exact contract.
Key details
- Solicitation number
- 15BBNF26Q00000039c
- NAICS code
- 221310 Water Supply and Irrigation Systems
- Size standard for this code
- 41 million dollars in average annual revenue
- Set-aside
- Small business set-aside
- Buying
- Service
- Place
- Grand Marsh, WI ยท Wisconsin bids
- Posted
- Nov 6, 2026
- Last changed
- Nov 10, 2026 (3 versions)
- Contact
- Contact details are on the SAM.gov notice. Open on SAM.gov
Description
The Federal Bureau of Prisons (FBOP) and the Federal Correctional Institution Oxford located at 350 Elk Avenue, Oxford, Wisconsin, intend to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to remove existing water softeners and install a new centralized water softener for the entire Institution. Awarded Contractor shall provide materials, labor, and equipment to remove existing water softeners, pipe through and install a new centralized water softener and all associated components. FCI Oxford currently has several commercial-grade water softeners which are failing to efficiently reduce water hardness and protect water systems, as well as connected equipment. The new centralized system should improve water quality, minimize calcium buildup, and extend the service life of plumbing infrastructure and appliances. The contractor would place a brine tank and softener to be installed at the water tower. Water would be treated right off the water main, therefore there would be no need for bagged salt to be brought in weekly.
Similar open bids
10 days leftNov 30, 2026
Re-Activation of Snake River Water Pump
FA4897 366 Cons Pkp
Small businessCombined Synopsis/Solicitation
48 days leftJan 7, 2027
Utilities Privatization of the Water System at U.S. Army Garrison-Hawaii (USAG-HI), Island of Oahu
DLA Energy
Solicitation
157 days leftApr 26, 2027
Single Purchase of an Agilent 8890 GC System Custom with dual ECD detectors
Region 4 Contracting Office
Special Notice
From SAM.gov and USAspending.gov public data. BidCamel adds the buyer and award facts.