Electric Power Resiliency Building 56
Combined Synopsis/Solicitation (Request for quotation) from Dla Distribution. Responses are due Dec 9, 2026 (19 days left).
- 19Days left to respond
- 35 daysThis buyer usually gives
- 36%Notices this buyer changes
- $191KTypical award from this office
What BidCamel found about this buyer
- This office usually gives bidders 35 days to respond; this notice gives 29 days.
- It changed 36% of its 45 notices after posting, so check for amendments before you submit.
- It has 4 open bids right now. See them all.
- It has made 2 awards in our records, typically $191K.
Companies this office paid before
- Amb Contracting Llc: 1 award, $369K total
- Package Research Laboratory Llc: 1 award, $13K total
These are past winners at this office, not the winner of this exact contract.
Key details
- Solicitation number
- SP330027Q0012
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation
- Size standard for this code
- 19 million dollars in average annual revenue
- Set-aside
- Small business set-aside
- Buying
- Service
- Place
- New Cumberland, PA ยท Pennsylvania bids
- Posted
- Nov 10, 2026
- Last changed
- Nov 12, 2026 (2 versions)
- Contact
- Contact details are on the SAM.gov notice. Open on SAM.gov
Description
Amendment 0001 is being issued to add Attachment 2, which is the Statement of Work. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at the Defense Distribution San Joaquin California. Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaic system for building 56. but not limited to: The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed the listing and qualification tests. All design and installation shall comply with the most recent version of each document. The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor. The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required. The PV systems shall be consistent with and adhere to all California Building Codes and standards, the California Solar Initiative program, and any and all CEC technical and installation specifications and guidelines. There is one existing electric substation feeding building 56 with a capacity: 12470/408V, 3000KVA transformer. Switchgear is rated: 4000A bus bar and four existing 1200A frame size circuit breaker spaces are available.
Similar open bids
1 day leftNov 20, 2026
Nhotic av system replacement
Oregon State Office
Small businessSolicitation
3 days leftNov 23, 2026
Automatic Transfer Switch (ATS) Preventive Maintenance and Repair Services, and Isolation Power Panel Inspection
255-NETWORK Contract Office 15 (36C255)
Solicitation
4 days leftNov 24, 2026
Electrical wiring install
Defense Health Agency
Small businessSolicitation
4 days leftNov 24, 2026
Brooklyn Upgrade Life Safety/Critical Branch Electrical Distribution Construction
Pcac (36C776)
Small businessSolicitation
6 days leftNov 25, 2026
USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements
Usda-fs, Csa Intermountain 9
Small businessCombined Synopsis/Solicitation
From SAM.gov and USAspending.gov public data. BidCamel adds the buyer and award facts.