Diaphram, primary
Solicitation (Request for quotation) from Navsup Weapon Systems Support Mech. Responses are due Nov 30, 2026 (11 days left).
- 11Days left to respond
- 47 daysThis buyer usually gives
- 56%Notices this buyer changes
- $789KTypical award from this office
What BidCamel found about this buyer
- This office usually gives bidders 47 days to respond; this notice gives 31 days.
- It changed 56% of its 942 notices after posting, so check for amendments before you submit.
- It has 496 open bids right now. See them all.
- It has made 34 awards in our records, typically $789K.
Companies this office paid before
- Martin-Baker Aircraft Company Limited: 5 awards, $24.2M total
- Nammo Defense Systems Inc.: 3 awards, $7.0M total
- Rockwell Collins, Inc.: 2 awards, $7.4M total
- Eaglepicher Technologies Llc: 2 awards, $5.5M total
- Applied Energy Technology Corp: 2 awards, $1.2M total
These are past winners at this office, not the winner of this exact contract.
Key details
- Solicitation number
- N0010427QXA12
- NAICS code
- 332722 Bolt, Nut, Screw, Rivet and Washer Manufacturing
- Size standard for this code
- 600 employees
- Set-aside
- Open to all (no set-aside)
- Buying
- Product
- Place
- Mechanicsburg, PA · Pennsylvania bids
- Posted
- Oct 30, 2026
- Last changed
- Nov 17, 2026 (2 versions)
- Contact
- Contact details are on the SAM.gov notice. Open on SAM.gov
Description
CONTACT INFORMATION|4|N774.7|BV5|771-229-0887|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT(COMBO)||TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECHANICSBURG| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to [email protected]. B. General Requirements: MIL-STD Packaging, Government Source Inspection Required. C. All freight is FOB Origin. D. This RFQ is for a BUY/Procurement. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. E. Only a Firm-Fixed Price (FFP) will be accepted. F. Must adhere to IUID requirements of DFARS 252.211-7003 G. The ultimate awardee of the proposed contract action must be an authorized source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization. H. Your quote should include the following information for justification purposes: - New procurement unit price____________________ - Total Price _____________________ - Procurement delivery lead time (PTAT) _________________ days - Award to CAGE _______________ - Inspection & Acceptance CAGE, if not at Award to CAGE _____________ - Cost breakdown requested, including profit rate (if feasible). - Quote expiration date _______________ (90 Days minimum is requested). - Delivery Vehicle (If Delivery Order requested)(e.g. if your CAGE has a current BOA/IDIQ) I. Important Traceability Notice: If you are not the manufacturer of the material you are offering, you must provide an official letter and/or email from the OEM confirming that your company is an authorized distributor of their items. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the NUT,SHAFT . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=MIL-STD-1330 | | |D |960920|A| | | DOCUMENT REF DATA=MIL-DTL-19595 | | |D |030211|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The NUT,SHAFT furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;53711 61960121 PN B16318-1 ; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Production Lot Approval (Government Testing) - Production Lot Test and approval is required. 3.4 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.5 Non-Magnetic Inspection shall be in accordance with MIL-DTL-19595. 3.6 The contractor shall notify the Government testing activity ;30; days prior to shipment of material to be tested. 3.7 Oxygen/Nitrogen Cleaning - Cleaning shall be in accordance with MIL-STD-1330. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise…
Similar open bids
1 day leftNov 20, 2026
Insert,screw thread
DLA Weapons Support
Small businessCombined Synopsis/Solicitation
1 day leftNov 20, 2026
Lever,manual control
DLA Weapons Support
Combined Synopsis/Solicitation
1 day leftNov 20, 2026
Clamp,loop
DLA Weapons Support
Small businessCombined Synopsis/Solicitation
1 day leftNov 20, 2026
Setscrew
DLA Weapons Support
Combined Synopsis/Solicitation
1 day leftNov 20, 2026
Cover,access
DLA Weapons Support
Combined Synopsis/Solicitation
From SAM.gov and USAspending.gov public data. BidCamel adds the buyer and award facts.