Data display group
Solicitation (Request for quotation) from Dla Aviation at Philadelphia, Pa. Responses are due Dec 7, 2026 (18 days left).
- 18Days left to respond
- 31 daysThis buyer usually gives
- 20%Notices this buyer changes
- $432KTypical award from this office
What BidCamel found about this buyer
- This office usually gives bidders 31 days to respond; this notice gives 31 days.
- It changed 20% of its 367 notices after posting, so check for amendments before you submit.
- It has 153 open bids right now. See them all.
- It has made 25 awards in our records, typically $432K.
Companies this office paid before
- Bae Systems Information and Electronic Systems Integration Inc.: 4 awards, $4.4M total
- Triman Industries Inc: 3 awards, $1.8M total
- The Entwistle Company Llc: 2 awards, $11.1M total
- Northrop Grumman Systems Corporation: 1 award, $3.4M total
- Carver Pump Company: 1 award, $1.7M total
These are past winners at this office, not the winner of this exact contract.
Key details
- Solicitation number
- SPRPA127QXA67
- NAICS code
- 334511 Search, Detection, Navigation, Guidance,
- Size standard for this code
- 1,350 employees
- Set-aside
- Open to all (no set-aside)
- Buying
- Product
- Place
- Philadelphia, PA · Pennsylvania bids
- Posted
- Nov 6, 2026
- Last changed
- Nov 6, 2026
- Contact
- Contact details are on the SAM.gov notice. Open on SAM.gov
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||X|AS/EN/JISQ 9100 or equivalent||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|INVOICE 2 IN 1 |TBD|SPRPA1|TBD|TBD|TBD|TBD|TBD|TBD|TBD|TBD||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Robyn Grinarml| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months |45 days after discovery of defect||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| COST ACCOUNTING STANDARD NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1|| INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (DEV 2026-O0048)(MAR 2026)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| This solicitation is being solicited under Emergency Acquisition Flexibilities (EAF) Authority formally known as Special Emergency Procurement Authority (SEPA). THIS IS A CRITICAL APPLICATION ITEM (CAI). No drawings are available for this Request for Quotation. Requested Delivery SUBCLIN: 0001AA Quantity: 10 Delivery Days: 382 Days The Government will consider all responsible offerors for award. The Government will evaluate offerors based on price, delivery timeframe, and past performance. All evaluation factors other than cost or price, when combined,are approximately equal to cost or price. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government. NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition. CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification. MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the…
Similar open bids
1 day leftNov 20, 2026
N0038327QF054
Navsup Weapon Systems Support
Presolicitation
1 day leftNov 20, 2026
TR-143A transducers
Nswc Crane
Presolicitation
1 day leftNov 20, 2026
Sextant, Marine; [WSDC: 23N] End Item: Ship, Ohio Class SSN (Trident) PR: 7017536460 NSN: 6605-012533442
DLA Aviation
Veteran-ownedPresolicitation
1 day leftNov 20, 2026
Waterlinked sonar systems and doppler velocity logs (dvl)
W2R2 USA Engr R & D Ctr
Small businessCombined Synopsis/Solicitation
1 day leftNov 20, 2026
Egyptian Navy Autonomous INTelligence System (AINTS) Platform Integration
Naval Information Warfare Systems
Solicitation
From SAM.gov and USAspending.gov public data. BidCamel adds the buyer and award facts.