Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Solicitation from Fermilab - Doe Contractor. Responses are due Dec 17, 2026 (28 days left).
- 28Days left to respond
- 24 daysThis buyer usually gives
- 33%Notices this buyer changes
- -Typical award from this office
What BidCamel found about this buyer
- This office usually gives bidders 24 days to respond; this notice gives 91 days.
- It changed 33% of its 15 notices after posting, so check for amendments before you submit.
- It has 9 open bids right now. See them all.
- We have no past awards from this office yet.
Key details
- Solicitation number
- RFP-376508-CD
- NAICS code
- 236210 Industrial Building Construction
- Size standard for this code
- 45 million dollars in average annual revenue
- Set-aside
- Open to all (no set-aside)
- Buying
- Service
- Place
- Batavia, IL · Illinois bids
- Posted
- Sep 17, 2026
- Last changed
- Oct 30, 2026 (4 versions)
- Contact
- Contact details are on the SAM.gov notice. Open on SAM.gov
Description
On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026. On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
Similar open bids
10 days leftNov 30, 2026
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
FA8137 Afsc Pzioc
Small businessSolicitation
10 days leftNov 30, 2026
IE181 - WHS Greenhouse Construction
Indian Education Acquisition Office
OtherSolicitation
10 days leftNov 30, 2026
Multiple Award Construction Contract (MACC)
FA7060 11TH Contracting Sq Pk
Sources Sought
20 days leftDec 10, 2026
NNSY DD4 Duct Insulation Replacement
Navfacsyscom Mid-atlantic
Solicitation
21 days leftDec 10, 2026
Travis AFB MACC
FA4427 60 Cons Lgc
Small businessSources Sought
From SAM.gov and USAspending.gov public data. BidCamel adds the buyer and award facts.