Butterfly vlv 3.00
Solicitation (Request for quotation) from Navsup Weapon Systems Support Mech. Responses are due Dec 7, 2026 (18 days left).
- 18Days left to respond
- 47 daysThis buyer usually gives
- 56%Notices this buyer changes
- $789KTypical award from this office
What BidCamel found about this buyer
- This office usually gives bidders 47 days to respond; this notice gives 32 days.
- It changed 56% of its 942 notices after posting, so check for amendments before you submit.
- It has 496 open bids right now. See them all.
- It has made 34 awards in our records, typically $789K.
Companies this office paid before
- Martin-Baker Aircraft Company Limited: 5 awards, $24.2M total
- Nammo Defense Systems Inc.: 3 awards, $7.0M total
- Rockwell Collins, Inc.: 2 awards, $7.4M total
- Eaglepicher Technologies Llc: 2 awards, $5.5M total
- Applied Energy Technology Corp: 2 awards, $1.2M total
These are past winners at this office, not the winner of this exact contract.
Key details
- Solicitation number
- N0010426QTC52
- NAICS code
- 332919 Other Metal Valve and Pipe Fitting Manufacturing
- Size standard for this code
- 750 employees
- Set-aside
- Open to all (no set-aside)
- Buying
- Product
- Place
- Mechanicsburg, PA · Pennsylvania bids
- Posted
- Nov 5, 2026
- Last changed
- Nov 5, 2026
- Contact
- Contact details are on the SAM.gov notice. Open on SAM.gov
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD|TBD|TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|[email protected]| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|x|x|x|||x|x||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| Accelerated and incremental delivery is encouraged and accepted before the delivery date(s) listed in the schedule. All freight is FOB Origin. This RFQ is for a buy. The resultant award of this solicitation will be issued Government source inspection is required. Unit Price:__________ FIRM Total Price:__________ FIRM Procurement Turnaround Time (PTAT) :__________ Awardee CAGE: __________ Manufacturing Facility CAGE, if not at source:__________ Packaging Facility CCAGE, if not at source: ___________ Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________ Important Traceability Notice: If you are not the manufacturer of the material you are offering, you must provide a letter/official email from the OEM confirming your company is an authorized distributor of their items. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the BUTTERFLY VLV 3.00 . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The BUTTERFLY VLV 3.00 furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;7KXG7 400300-110NT8QT/G002; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document…
Similar open bids
1 day leftNov 20, 2026
Packing shutoff vavles
DLA Maritime - Norfolk
Small businessCombined Synopsis/Solicitation
1 day leftNov 20, 2026
Valve,diaphragm con
SPRMM1 DLA Mechanicsburg
Solicitation
1 day leftNov 20, 2026
Valve,rotary,select
DLA Aviation at Philadelphia, Pa
Solicitation
1 day leftNov 20, 2026
Cca,eps control
SPRMM1 DLA Mechanicsburg
Solicitation
1 day leftNov 20, 2026
Repair module,strai
Navsup Weapon Systems Support Mech
Solicitation
From SAM.gov and USAspending.gov public data. BidCamel adds the buyer and award facts.