Actuator,hydraulic-, in repair/modification of

Solicitation (Request for quotation) from Navsup Weapon Systems Support Mech. Responses are due Nov 30, 2026 (10 days left).

Open to all (no set-aside)Any registered business can bid, large or small.Who qualifies
  • 10Days left to respond
  • 47 daysThis buyer usually gives
  • 56%Notices this buyer changes
  • $789KTypical award from this office

What BidCamel found about this buyer

  • This office usually gives bidders 47 days to respond; this notice gives 33 days.
  • It changed 56% of its 942 notices after posting, so check for amendments before you submit.
  • It has 496 open bids right now. See them all.
  • It has made 34 awards in our records, typically $789K.

Companies this office paid before

  • Martin-Baker Aircraft Company Limited: 5 awards, $24.2M total
  • Nammo Defense Systems Inc.: 3 awards, $7.0M total
  • Rockwell Collins, Inc.: 2 awards, $7.4M total
  • Eaglepicher Technologies Llc: 2 awards, $5.5M total
  • Applied Energy Technology Corp: 2 awards, $1.2M total

These are past winners at this office, not the winner of this exact contract.

Key details
Solicitation number
N0010427QZA04
NAICS code
332919 Other Metal Valve and Pipe Fitting Manufacturing
Size standard for this code
750 employees
Set-aside
Open to all (no set-aside)
Buying
Product
Place
Mechanicsburg, PA · Pennsylvania bids
Posted
Oct 28, 2026
Last changed
Oct 29, 2026 (2 versions)
Contact
Contact details are on the SAM.gov notice. Open on SAM.gov

Description

CONTACT INFORMATION|4|N742.10|WV2BB|N/A|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION/ACCEPTANCE POINT|6||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Material - Invoice and Receiving Report (COMBO)|N/A|TBD|N00104|TBD|TBD|N50286|TBD|N/A|N/A|N/A|N/A|N/A|N/A|N/A|1-866-618-5988 - WAWF Helpdesk| MONETARY LIMITATION REPAIR PURCHASE ORDERS|1|TBD| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. All contractual documents (i.e., contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either in the mail, transmitted by facsimile, or sent by other electronic methods, such as email. The Government's acceptance of the contract proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. The following proposed delivery schedule applies: Final delivery of material shall be on or before 86 days after the effective date of the contract. 3. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See FAR Clause 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 4. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 5. All transportation to/from the repair site will be paid for by the US Navy. 6. Include in the estimated price all costs associated with receipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV reporting. Please include the following: a. Teardown and Evaluation Rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration Date: A cost of new price shall also be provided in addition to the repair price. 7. This requirement utilizes Government Furnished Property (GFP). Any GFP located at the contractor's facility in storage that can be used for repair of the requirement must be utilized and called out within the final quote. 8. The contractor shall comply with the Commercial Asset Visibility (CAV) of the asset(s) in this order in accordance with NAVSUPWSSFA24. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the ACTUATOR,HYDRAULIC- . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;30093-40940 07270 B D; DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01| 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. 3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied. 3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this Contract, including all testing and military specification requirements. 3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Drawing…

Read the full notice and attachments on SAM.gov

Similar open bids

All open bids for NAICS 332919

From SAM.gov and USAspending.gov public data. BidCamel adds the buyer and award facts.

Save and get alerts